top of page

De Santis Project 

The De Santis project was completed during the summer of 2018 for Olga and Paul. Many man hours went into this project as it was very labour intensive. The material had to be brought in through the alley and up a 4ft retaining wall which made this project very labour intensive. This project involved building a paving stone walkway with Banas stone stairs, a pergola leading down to a fire pit with large boulders for seats, raised flower beds and re-installing the existing sprinkler system. 

bottom of page